by 5TFR4NC15-5FP0 | Jan 26, 2021 | NPC Projects
Advisian Spit Protection Preliminary Report Download Document River, Spit and Beach Long Term Solution (Phase 2) The long term solution includes a groyne field and some 1 million cubes of sand placed on the 2,7km length of the beach from the river mouth to the...
by 5TFR4NC15-5FP0 | Jan 26, 2021 | NPC Projects
Arterial Roads The arterial roads we specified in the SRA Business Plan include the Village Entrance, Lyme Road North and South, and St Francis Drive from Lyme Road north to Assissi Drive alongside the Tennis Courts. Village Entrance We completed the Village Entrance...
by 5TFR4NC15-5FP0 | Jan 26, 2021 | NPC Projects
David Truter leads our portfolio of CCTV cameras and Chairs the St Francis Bay Police Sector Forum for security. The SFPO NPC installed the cameras in early 2019. Crime had been escalating at that time. 18 months later crime has been radically reduced as a result. For...